DG Display Showcase Manufacturers & Suppliers - 26 Years DG Master of Custom Display Showcase +8613610079233
sales@degreefurniture.com
Ensure that it is strictly supplied in time according to the delivery time and product quality requirements of the acquirer, and it is delivered to the designated address. In the transportation process of all equipment, we will pack up strictly according to standardized protection measures. The packaging meets the requirements of long -distance transportation, moisture -proof, shockproof, rust -proof, etc.
Transportation conditions: special car auto transportation. Before the exhibition cabinet is unloaded, contact the person in charge of the construction site in advance to help clean up the place and channel of the goods placement. During the handling process, we must fully consider that the safety and other buildings and equipment should be handled by two or more people.
To determine the placement of the showcase beforehand, determine the way of transporting and organize personnel to carry the goods to the designated orientation, it shall not affect the operation of other construction personnel. When unloading from the car, unload it safely and steadily at the designated area. When moving indoors, more than two personnel are carried out when ensuring safety.
When opening the box, you should operate carefully to avoid damage to the cabinet; remove the wooden packaging for transportation, the packaging paper should be packed in time. Before assembly, we must fully protect and clean up the ground, and push the showcase to the corresponding orientation to use the connector to connect and fix the feet. Establish a structure, from more than four personnel equipment to avoid bumps.
Device lamps, fix the spotlight into the holes reserved in advance, and fix the T5 fill lights in series. To settle cables, all cables use national standard cables and it is necessary to wear flame retardant pipes. Powering power cords, leakage protection equipment, opening system, and lighting accurately connect to the power.
Equipment debugging the system, equipment elastic motor, remote control locks, linear orbit, profile. Requires to open the stable limit accuracy. The equipment glass is carried into the U -shaped groove from 4 or more operators to use professional things, and evenly condition the gaps and strokes between the glass.
Equipment cloth board, back panel, acrylic, aluminum grille. .
Jewelry showcase manufacturers
Watch display showcase manufacturer